One Stop Mining Parts Water Cooling System for Bitmain Anterminer ASIC Miners
Weight | 6000 g |
---|---|
Dimensions | 30 × 21 × 15 cm |
Water cooling plate | Size: 118*178*14.5mm |
Pipe connector | Size: 2CM*1.2CM |
Pipe connector-1 | Size: 1CM*0.8CM |
Pipe | Size: 0.8CM |
Please see this prompt
|
||||
1. Due to the different water-cooling plates matched with various models of the S19 series, please consult customer service before placing an order.
|
||||
2. It is recommended to use the sinowell overclocking power supply to achieve overclocking. Use the original 4000W power supply. If the power cannot be satisfied, overclocking will easily damage the machine.
|
||||
3. Before powering on, please run the water cycle to check that there is no overflow, and then run the machine. The initial installation should be observed for a period of time.
|
||||
4. This set of plans is not equipped with external inlet and outlet water pipes/trachea pipes. If you need to customize, you can consult customer service.
|
||||
5. For detailed installation videos and pictures, please consult customer service.
|
Product Specifications
|
||||
S19 PRO 110T is overclocked to 160-185T, effectively solving the problem of chip heat dissipation
|
||||
water cooling plate
|
Specification:
|
118*178*14.5mm
|
quantity:
|
6 pcs + manifold*4
|
pipe connector
|
Specification:
|
1CM*0.8CM
|
quantity:
|
24 pcs(installed on manifold and water cooling plate)
|
pipe connector
|
Specification:
|
2CM*1.2CM
|
quantity:
|
4 pcs (installed on the manifold)
|
pipe
|
Specification:
|
0.8CM
|
quantity:
|
1 meter
|
Recommended use environment:
|
||||
In an environment where water is convenient to obtain around rivers and ravines or the cost of water is low, the method of entering cold water into hot water and discharging it can be used directly!
If it is used in buildings such as workshops and computer rooms, it needs to be equipped with water cooling towers or refrigerators for water cooling.
The freezing prevention pipes in alpine areas can use ethylene glycol liquids with different concentrations to replace water according to the temperature!
|
||||
Recommended cooling tower selection
|
||||
The heat dissipation of a single S19PRO overclocked to 7000W is about 1600W, and the required cooling capacity is about 3600W. According to the parameters provided by the manufacturer as shown in the figure below, the parameters of each manufacturer have a small deviation.
For example, the cooling capacity of a 10T tower is 58k÷3.6kw=16.2. The heat dissipation is less than the cooling capacity, so 20% of the heat dissipation should be reserved, 16.2-16.2×20%=13 units, that is, a 10T cooling tower can bring 13 units.
Combined with other specifications of cooling towers, the water tower per tonnage can be calculated. The number of machines that can be brought is 1.3 units
|
||||
Pump selection
|
||||
The water cooling plate adopts the inlet and outlet pipes of 12mm. According to the calculation, the 12mm pipe is calculated as 1 ton per hour, the number of machines × 1 ton/hour = the flow rate of the pump
|
||||
water cooling plate size:
|
Package weight
|
5KG
|
||
Package dimensions
|
300*212*152MM
|
Step 1: Remove the front and rear fans of the S19PRO.
|
||||
Step 2: Remove the air cooling fin of the hash board.
|
||||
Step 3: Align the screw holes on the hash board, install the water-cooling board, and pay attention to the direction of the water-cooling board’s water inlet.
|
||||
Step 4: Put the hash board back into the machine, insert the water pipe of the water divider, and connect it to the hash board, and each horizontal component is connected to a water divider.
|
||||
Step 5: Install the front fan and the rear water cooling plate back, and use the provided 12mm water pipe joint to install and fix the water distributor to the water cooling plate.
|
||||
Step 6: Turn on the water circulation, check all connection positions, and check whether there is overflow at the faucet. Be sure to run the water circulation first to check that there is no overflow, and then run the machine. The initial installation should be observed for a while.
|